Labels:bulletin board | web site OCR: Exit Sign Cost Factors Problem Statement Acquisition Cost of the signs and related hardware Scenario Background (breakers, wiring, etc) Technical Installation Cost (mounting, wiring, etc) Background Product Service Contracts to insure 100 product reliability Buildings Applications ir (optional electric only) High Profile Minimum Maintenance parts replacement (bulbs, Installat ions ba atteries etc) Exit Signs Codes Standards Power Consumption Relevant Studies CPREV HEXT Application batteries PREV MEXT